Cable_Bolt_Drilling.JPG
Cable Bolt/Depressurisation
Drilling.

Probe_Drilling_Queenstown.jpg
Probe Hole Drilling.

Drainage_Holes.jpg
Drainage/Depressurisation
Drilling.

Construction_Drilling.JPG
Small Construction Drill.

Construction, Probe, Cable Bolt & Depressurisation Drilling

Cable Bolt/Depressurisation Drilling
On many occasions Inline's drilling rigs are used to drill "Cable Bolt" or "Drainage Hole" into permanent or temporary batters.
The angle and design of these drill holes are critical to achieving the desired results therefore maintaining the integrity of the batter for the life of mine/quarry.

For any of these services call Glenn on 021 855 963


Probe Hole Drilling
"Probe Hole" drilling is used to identify old underground workings, void areas within the rock mass and occasionally to define over burden limits or hard rock boundaries within Quarry's.
"Probe" Drilling can also be used when building or designing new roads to provide the engineer with a better understanding of the in-situ material to be constructed upon.





Drainage/Depressurisation Holes
As shown here "Drainage" or depressurisation holes are drilled into the permanent or temporary batter to relieve the pressure from the high wall by remove the water/fluids.
Specially perforated drainage pipe is then used to line the drilled hole to maintain the flow of fluids.






Construction Drilling
Inline Drilling can provide small drilling rigs for those construction type projects where the environmental restraints and the publics perception of the works is paramount.

Click here for our contact details....
 
About our company
Enter a succinct description of your company here
Contact Us
Enter your company contact details here